Sheet Piles

Sheet Piles

  • Trench Control carries a stock of over 2000 tonnes.
  • Requires minimum 16TN excavator to install.
  • Installed using an excavator mounted vibro hammer (EMV) up to a length of 6m.
  • Max length of sheet without an extension arm is 6m.
  • Extension arms are available for longer length sheets.
  • TCL Contracting Dept offers installation using side grip hammer and leader rig up to 17m in length.
  • Selection of z-piles available upon request.
PRODUCT WIDTH PAIR B (MM) DEPTH WALL H (MM) THICKNESS OF PAN T (MM) THICKNESS OF WINGWALL S (MM) SECTIONAL AREA (CM²/M) WEIGHT (KG/M) MOMENT OF INERTIA (CM⁴/M) ELASTIC SECTION MODULUS (CM³/M)
PU 18(−1) 600 430 10.2 8.4 154 72.6 35950 1670
PU 22(−1) 600 450 11.1 9.0 174 81.9 46380 2060
PU 22(+1) 600 450 13.1 10.0 192 90.4 52510 2335
PU 28(−1) 600 452 14.2 9.7 207 97.4 60580 2680

ACCESSORIES:

  • Lifting Shoes
  • Excavator Mounted Vibro Hammer (Emv)
  • Extension Arm For Excavator
  • Corner Piles Available
  • Camlock
  • Edge Protection System
  • Access Gate
  • Davit Arm + Rescue Kit