The first outing on site for our new side grip vibro hammer which installed 5-6.5m sheets into medium dense ground conditions for Glebe Builders in Naas.
The old store was demolished in early April to make way for new
larger supermarket but the boundary line required to retained temporarily whilst a new RC wall could be constructed for the new structure.
TCL mobilised the excavator and new Movax SG80VA as space was tight on site for a rig and the site team vibro installed 127No
temporary sheets in cantilever to retain 2.5m of the embankment.
This allowed Glebe Builders to strike and pour the permanent
concrete retaining wall before TCL returned and extracted the sheets with crane suspended vibro hammer.