North Leixlip Sewage Works

Client: Terra Solutions
Services: Temporary works design, supply of ground support system

The Lower Liffey Valley Sewerage Scheme Wastewater Treatment Plant Upgrade aims to upgrade the existing Leixlip WWTP from 80,000 population equivalent to its ultimate capacity of 150,000.

The WwTP expansion is required to accommodate predicted future increases in wastewater flows up to a population equivalent of 150,000 PE from an expanding domestic, industrial and commercial population. The proposed WwTP expansion will provide secondary and tertiary treatment with nutrient removal. The WwTP will discharge final effluent to the River Liffey at Leixlip.

Working for Terra Solutions, Trench Control provided a series of temporary works designs and supply of ground support equipment for multiple excavations required as part of the works. The works included launch and reception pits for tunnelling works beneath the Royal Canal and a series of smaller pits for the construction of ancillary chambers.

North-Leixlip-Sewage

Share:

More Posts

Adare Bypass, Co. Limerick

The Adare Bypass is part of a Sisk Sorenson joint venture to complete 7km of motorway from Foynes to Limerick City by June 2027 at an approx. cost of €150m. One of the projects key objectives is to remove the congestion from the N21 prior to the hosting of the RyderCup at Adare Manor September 2007. Trench Control were asked

Naas, Co. Kildare

The first outing on site for our new side grip vibro hammer which installed 5-6.5m sheets into medium dense ground conditions for Glebe Builders in Naas. The old store was demolished in early April to make way for newlarger supermarket but the boundary line required to retained temporarily whilst a new RC wall could be constructed for the new structure.