Case Studies

Osberstown Wastewater Treatment Plant Upgrade

Client: Bam Contractors
Services: Temporary works design, supply of ground support system

County Kildare’s population has increased dramatically since 2006 and Kildare is now the 4th most populous county in the Republic. Consequently, an application to the DoEHLG was been submitted by Kildare County Council for a Stage III upgrade to the Osberstown facility to 130,000 population equivalent (from 80,000 p.e.). The new works will facilitate predicted future increases in wastewater flows from an expanding domestic, industrial and commercial population. In addition, the state of the art wastewater treatment plant will treat the wastewater to the highest standards, ensuring that the local environment is greatly enhanced.

Working for Bam, Trench Control designed the ground support systems for a series of structures including new inlet works, outlet works, effluent sampling and distribution chambers and tunnel launch and reception shafts for a pipejacked crossing of the adjacent M7 motorway. Retained heights varied from 7m to 10m for the majority of the structures. The temporary works included sheet piles and proprietary hydraulic propping elements.

Osberstown

Share:

More Posts

Adare Bypass, Co. Limerick

The Adare Bypass is part of a Sisk Sorenson joint venture to complete 7km of motorway from Foynes to Limerick City by June 2027 at an approx. cost of €150m. One of the projects key objectives is to remove the congestion from the N21 prior to the hosting of the RyderCup at Adare Manor September 2007. Trench Control were asked

Naas, Co. Kildare

The first outing on site for our new side grip vibro hammer which installed 5-6.5m sheets into medium dense ground conditions for Glebe Builders in Naas. The old store was demolished in early April to make way for newlarger supermarket but the boundary line required to retained temporarily whilst a new RC wall could be constructed for the new structure.