Altnagelvin Hospital, Londonderry

Client: McLaughlin & Harvey

Services: Temporary works design

Altnagelvin Hospital’s new £50+million Radiotherapy Unit, which is due to open in 2016, will increase Radiotherapy capacity in Northern Ireland. The Radiotherapy Unit at Altnagelvin is envisaged, not as a single building, but as interconnected clinical areas which are designed along the continuum of the “garden” that incorporates both the external existing landscape and the internal path of the patient’s journey.

Working for McLaughlin & Harvey, Trench Control designed and installed a bespoke temporary works solution to support a section of existing tunnel connecting the existing maternity unit to the rest of the hospital. The tunnel remained live while a section of new tunnel servicing the radiotherapy unit was constructed underneath. The support involved insertion of needles to the soffit of the existing tunnel and the primary support beams were supported on secant piles which also formed the temporary shoring forming the new section of tunnel.

cs1

Share:

More Posts

Bennetstown, Dunboyne, Co Meath

Rossmore Civil, working directly for Glenveagh Homes on a housing development in Dunboyne to construct 578 new homes, appointed Trench Control Ltd to design and install a 23m x 21m cofferdam with additional 5.5m x 10m pumping chamber annex to a dig depth of 6.5m. The ground conditions were particularly hard with localized boulder clay, therefor TCL needed to pre-auger