Smithfield Square, Hornsey, London N8

Client: Keltbray Piling
Services: Contiguous pile wall and bearing pile design

Keltbray Piling were nominated by St. James Group to undertake the design and construction of a section of contiguous pile retaining wall and bearing piles of the proposed development of Hornsey Depot in Hornsey, London N8. The consulting engineers for the project are Powell, Tolner & Associates. The retaining wall and pile design was undertaken by Trench Control Ltd. on behalf of Keltbray Piling.

In broad terms, the project involves Demolition of existing structures and buildings and redevelopment of the site to provide a mixed-use development on Hornsey High Street; two live/work units fronting onto Cross Lane; together with private amenity space and new public realm, including publicly accessible routes through the site; an energy centre; 178 car parking spaces for the residential use (within a basement and undercroft); cycle parking; refuse storage; recycling centre in the foodstore car park; access; and other infrastructure work. The contiguous pile wall forms a load bearing retaining wall (as part of Block A) to properties on the NE boundary properties.

cs3 cs2

Share:

More Posts

Naas, Co. Kildare

The first outing on site for our new side grip vibro hammer which installed 5-6.5m sheets into medium dense ground conditions for Glebe Builders in Naas. The old store was demolished in early April to make way for newlarger supermarket but the boundary line required to retained temporarily whilst a new RC wall could be constructed for the new structure.

Balmostone, Donabate, Co Dublin

Glenveagh Homes commenced construction of 1,200 new homes at Balmoston,a 32 hectare site in Donabate, North Co Dublin. The first phase of construction consists of 432 affordable, private, cost rental and social homes. As part of the civil infrastructure for this site, Glenveagh has to install a deep water attenuation tank to manage the surface water run off more than