Construction of a roll on roll off dock for the new Greenore to Greencastle ferry

Trench Control recently completed a piling project on behalf of L & M Keating at Greenore Co. Louth. The project involved the construction of a roll on roll off dock for the new Greenore to Greencastle ferry, a €10m project.

TCL drove 60 no. sheet piles up to 11.0m in depth to form a cofferdam, as well as 22 no. standalone tubes of up to 22.0m depth. The tidal range and strong currents presented technical challenges as well as requiring a huge degree of flexibility in working hours. TCL fabricated a bespoke piling gate suitable for driving tubes over water at our Naas premises, and installed on site.

The job however was delivered to an exacting specification and on time. Click here to download the project fact sheet.

Share:

More Posts

Adare Bypass, Co. Limerick

The Adare Bypass is part of a Sisk Sorenson joint venture to complete 7km of motorway from Foynes to Limerick City by June 2027 at an approx. cost of €150m. One of the projects key objectives is to remove the congestion from the N21 prior to the hosting of the RyderCup at Adare Manor September 2007. Trench Control were asked

Naas, Co. Kildare

The first outing on site for our new side grip vibro hammer which installed 5-6.5m sheets into medium dense ground conditions for Glebe Builders in Naas. The old store was demolished in early April to make way for newlarger supermarket but the boundary line required to retained temporarily whilst a new RC wall could be constructed for the new structure.