Clonakilty Wastewater Treatment Plant Upgrade (Carberry-Muskerry Wastewater Treatment Plant)

Client: EPS Pumping and Treatment Systems
Services: Temporary works design, supply and installation of ground support system

The Carbery/Muskerry Wastewater Treatment Plants DBO (design, build and operate) and O&M (operate and maintain) Contract for €6million is primarily a contract to carry out upgrade works to the existing wastewater treatment plant in Clonakilty, providing a treatment capacity of 20,500PE (population equivalent).

Working for EPS, Trench Control designed and installed cantilever (unpropped) sheet piles for a 5m approximate retained height for the new Nereda tank. The primary difficulty on the project was the groundwater control given the tidal groundwater regime and underlying permeable gravels. Trench Control provided advice and proposed and installed a dewatering well layout which allowed the cofferdam to be dewatered effectively and allowing construction of the tank to a tight construction programme.

Share:

More Posts

Adare Bypass, Co. Limerick

The Adare Bypass is part of a Sisk Sorenson joint venture to complete 7km of motorway from Foynes to Limerick City by June 2027 at an approx. cost of €150m. One of the projects key objectives is to remove the congestion from the N21 prior to the hosting of the RyderCup at Adare Manor September 2007. Trench Control were asked

Naas, Co. Kildare

The first outing on site for our new side grip vibro hammer which installed 5-6.5m sheets into medium dense ground conditions for Glebe Builders in Naas. The old store was demolished in early April to make way for newlarger supermarket but the boundary line required to retained temporarily whilst a new RC wall could be constructed for the new structure.