Lidl, Craigavon, Co. Armagh

Ganson Building & Civil have been appointed main contractor for the installation of a new Lidl store in Rushmore Shopping Centre on the site of the former Sainsbury’s petrol station & carwash in Craigavon.

A deep drainage design has been proposed for both foul and surface water which requires a diversion & upgrade of the existing system.

TCL have been appointed to design and install sheet pile cofferdams up to 8m deep, with minimal toe incorporating up to 4 levels of hydraulic frames, to allow safe access at the formation level and installation of pipework.

Back to back frame levels in stiff ground has proven difficult for the piling crew and open flight auguring has been adopted in some areas to ensure sheets can be driven to design depth.

A challenging design and install but progress was made to meet to the proposed programme and the opening of the new store on time.

Share:

More Posts

Naas, Co. Kildare

The first outing on site for our new side grip vibro hammer which installed 5-6.5m sheets into medium dense ground conditions for Glebe Builders in Naas. The old store was demolished in early April to make way for newlarger supermarket but the boundary line required to retained temporarily whilst a new RC wall could be constructed for the new structure.

Balmostone, Donabate, Co Dublin

Glenveagh Homes commenced construction of 1,200 new homes at Balmoston,a 32 hectare site in Donabate, North Co Dublin. The first phase of construction consists of 432 affordable, private, cost rental and social homes. As part of the civil infrastructure for this site, Glenveagh has to install a deep water attenuation tank to manage the surface water run off more than