Next Generation Power Station, Tarbet, Co. Kerry

Atlantic Projects Company (APC) and Ansaldo Energia have partnered with SSE Thermal to construct a €300 million next generation power station on the site of the existing power station in Tarbet, Co. Kerry.

The plant will run on 100% Hydrotreated Vegetable Oil (HVO) which is a sustainable biofuel and is designed to provide flexible low carbon back up power source to supplement the national grid system.

The project commenced summer 2025 and is due for completion late 2027.

Trench Control Ltd have been awarded the piling flood wall defense contract which involves the installation of 1241No VL605A driven sheet piles.

Share:

More Posts

Adare Bypass, Co. Limerick

The Adare Bypass is part of a Sisk Sorenson joint venture to complete 7km of motorway from Foynes to Limerick City by June 2027 at an approx. cost of €150m. One of the projects key objectives is to remove the congestion from the N21 prior to the hosting of the RyderCup at Adare Manor September 2007. Trench Control were asked

Naas, Co. Kildare

The first outing on site for our new side grip vibro hammer which installed 5-6.5m sheets into medium dense ground conditions for Glebe Builders in Naas. The old store was demolished in early April to make way for newlarger supermarket but the boundary line required to retained temporarily whilst a new RC wall could be constructed for the new structure.