Mode Wheel Flood Defence Works

McLaughlin & Harvey won this contract with clients Peel for Manchester District Council to install ground stabilization works along the canal side in Manchester’s Mode Wheel. Adjoining land owned by Valero has large petrochemical tanks that had been monitored for movement due to the underscoring of the river bank when water levels are high and the flood water are let through the old Mode-Wheel locks. TCL were appointed specialist piling sub-contractor to install new combi wall running parallel to the existing river bank and assist in the stabilisation of the existing bank.

View full project PDF

Share:

More Posts

Adare Bypass, Co. Limerick

The Adare Bypass is part of a Sisk Sorenson joint venture to complete 7km of motorway from Foynes to Limerick City by June 2027 at an approx. cost of €150m. One of the projects key objectives is to remove the congestion from the N21 prior to the hosting of the RyderCup at Adare Manor September 2007. Trench Control were asked

Naas, Co. Kildare

The first outing on site for our new side grip vibro hammer which installed 5-6.5m sheets into medium dense ground conditions for Glebe Builders in Naas. The old store was demolished in early April to make way for newlarger supermarket but the boundary line required to retained temporarily whilst a new RC wall could be constructed for the new structure.