Mode Wheel Flood Defence Works

McLaughlin & Harvey won this contract with clients Peel for Manchester District Council to install ground stabilization works along the canal side in Manchester’s Mode Wheel. Adjoining land owned by Valero has large petrochemical tanks that had been monitored for movement due to the underscoring of the river bank when water levels are high and the flood water are let through the old Mode-Wheel locks. TCL were appointed specialist piling sub-contractor to install new combi wall running parallel to the existing river bank and assist in the stabilisation of the existing bank.

View full project PDF

Share:

More Posts

Bennetstown, Dunboyne, Co Meath

Rossmore Civil, working directly for Glenveagh Homes on a housing development in Dunboyne to construct 578 new homes, appointed Trench Control Ltd to design and install a 23m x 21m cofferdam with additional 5.5m x 10m pumping chamber annex to a dig depth of 6.5m. The ground conditions were particularly hard with localized boulder clay, therefor TCL needed to pre-auger