Mutton Island Wastewater Treatment Plant Upgrade

Client: Siac
Services: Temporary works design, supply and installation of ground support system

The rapid growth of Galway city and environs now means that the existing Mutton Island Wastewater Treatment Plant is nearing design capacity and with growth projected to continue, there is a requirement to increase its capacity to cater for both residential and industrial expansion within the catchment area. TheMutton Island Wastewater Treatment Plant, completed in 2003, was designed to cater for 91,600 population equivalent. The upgrade works involve a design and build upgrade to the plant to increase capacity to 170,000 population equivalent.

Working for Siac, Trench Control designed and installed a series of temporary works schemes for a number of structures for the project including two pumping stations and flow meter and discharge chambers. The temporary works typically involved sheet piles and bespoke propping scheme owing to the constraints associated with the retrofitting of existing structures in the existing facility.

Share:

More Posts

Naas, Co. Kildare

The first outing on site for our new side grip vibro hammer which installed 5-6.5m sheets into medium dense ground conditions for Glebe Builders in Naas. The old store was demolished in early April to make way for newlarger supermarket but the boundary line required to retained temporarily whilst a new RC wall could be constructed for the new structure.

Balmostone, Donabate, Co Dublin

Glenveagh Homes commenced construction of 1,200 new homes at Balmoston,a 32 hectare site in Donabate, North Co Dublin. The first phase of construction consists of 432 affordable, private, cost rental and social homes. As part of the civil infrastructure for this site, Glenveagh has to install a deep water attenuation tank to manage the surface water run off more than