Case Studies

Berth 35, Dublin Port

Roadbridge had secured, through a joint venture with Keating’s, the redevelopment of Dublin Port and had already successfully extended and upgraded several berths prior to TCL being invited to tender. The subsequent demise of Keating’s meant the JV partnership had been dissolved leaving large areas of the development plan still to be constructed. On the foot of successful combi-wall installations for other contractors using the ALPS hydraulic gate system, Roadbridge approached Trench Control to engage them as specialist piling contractors to install Berth-35 in the absence of JV partner Keating’s.

Share:

More Posts

Balmostone, Donabate, Co Dublin

Glenveagh Homes commenced construction of 1,200 new homes at Balmoston,a 32 hectare site in Donabate, North Co Dublin. The first phase of construction consists of 432 affordable, private, cost rental and social homes. As part of the civil infrastructure for this site, Glenveagh has to install a deep water attenuation tank to manage the surface water run off more than

Bennetstown, Dunboyne, Co Meath

Rossmore Civil, working directly for Glenveagh Homes on a housing development in Dunboyne to construct 578 new homes, appointed Trench Control Ltd to design and install a 23m x 21m cofferdam with additional 5.5m x 10m pumping chamber annex to a dig depth of 6.5m. The ground conditions were particularly hard with localized boulder clay, therefor TCL needed to pre-auger