Case Studies

Berth 35, Dublin Port

Roadbridge had secured, through a joint venture with Keating’s, the redevelopment of Dublin Port and had already successfully extended and upgraded several berths prior to TCL being invited to tender. The subsequent demise of Keating’s meant the JV partnership had been dissolved leaving large areas of the development plan still to be constructed. On the foot of successful combi-wall installations for other contractors using the ALPS hydraulic gate system, Roadbridge approached Trench Control to engage them as specialist piling contractors to install Berth-35 in the absence of JV partner Keating’s.

Share:

More Posts

Adare Bypass, Co. Limerick

The Adare Bypass is part of a Sisk Sorenson joint venture to complete 7km of motorway from Foynes to Limerick City by June 2027 at an approx. cost of €150m. One of the projects key objectives is to remove the congestion from the N21 prior to the hosting of the RyderCup at Adare Manor September 2007. Trench Control were asked

Naas, Co. Kildare

The first outing on site for our new side grip vibro hammer which installed 5-6.5m sheets into medium dense ground conditions for Glebe Builders in Naas. The old store was demolished in early April to make way for newlarger supermarket but the boundary line required to retained temporarily whilst a new RC wall could be constructed for the new structure.