Berth 7 & 8 Combi Wall Installation

Following on from Farrans successful installation of the south side deep water berth at Montrose Harbour, they were the preferred bidder for berths 7&8 on the north side harbour. The existing berths were dilapidated to a state that significant point loads were no longer deemed safe. Farrans were appointed main contractor to install a new combi-wall running the length of the 2 existing berths incorporating tie back anchor wall and decking piles to form a structural stable berth where ships could dock.

The project was to split into 2 phases starting with phase one to install 72No anchor tubes, 34No combi wall tubes with 33No infill AZ sheets and 2 return AZ sheet pile wing walls.

View full project PDF

Share:

More Posts

Naas, Co. Kildare

The first outing on site for our new side grip vibro hammer which installed 5-6.5m sheets into medium dense ground conditions for Glebe Builders in Naas. The old store was demolished in early April to make way for newlarger supermarket but the boundary line required to retained temporarily whilst a new RC wall could be constructed for the new structure.

Balmostone, Donabate, Co Dublin

Glenveagh Homes commenced construction of 1,200 new homes at Balmoston,a 32 hectare site in Donabate, North Co Dublin. The first phase of construction consists of 432 affordable, private, cost rental and social homes. As part of the civil infrastructure for this site, Glenveagh has to install a deep water attenuation tank to manage the surface water run off more than