Northumberland Energy Park

Following on from our successful installation of the south side deep water berth 9 & 10 at Montrose Harbour, Farrans Construction engaged Trench Control services again to utilise our hydraulic piling gate for a similar deep water berth in the north east of England. Northumberland Energy Park Phase 1 is to transform an existing dock into a deep water berth with jack up barge capabilities and is part of a strategic land development plan for the Blyth estuary.

View Full Project PDF

Share:

More Posts

Bennetstown, Dunboyne, Co Meath

Rossmore Civil, working directly for Glenveagh Homes on a housing development in Dunboyne to construct 578 new homes, appointed Trench Control Ltd to design and install a 23m x 21m cofferdam with additional 5.5m x 10m pumping chamber annex to a dig depth of 6.5m. The ground conditions were particularly hard with localized boulder clay, therefor TCL needed to pre-auger