Case Studies

Cathedral Road Pumping Station, Cavan Town

Client: P&S Civil Works
Services: Temporary works design for ground support

P&S Civil Works Ltd. appointed Trench Control Ltd. (TCL) to design ground support measures to facilitate the construction of the Cathedral Road Pumping Station for the Cavan Sewage Scheme project. The overall project has been designed by the EMCA. P&S Civil Works Ltd. are the Main Contractor with Trench Control being appointed Temporary Works Designer for the ground support measures only.

The proposed pumping station is approximately 13.1m x 8.3m on plan at the ground surface with the deeper section of the tank at 8.3m x 8.3m on plan. In order to construct the deeper section of the tank, it is proposed to construct a cofferdam of 10.3m x 10.3m on plan to allow for 1m of working room all around. The maximum excavation depth is approximately 9.1m from existing ground level. Design work included routine site inspection to verify the stability of the rock mass exposures and development of contingency rock mass support measures.

cs4

Share:

More Posts

Naas, Co. Kildare

The first outing on site for our new side grip vibro hammer which installed 5-6.5m sheets into medium dense ground conditions for Glebe Builders in Naas. The old store was demolished in early April to make way for newlarger supermarket but the boundary line required to retained temporarily whilst a new RC wall could be constructed for the new structure.

Balmostone, Donabate, Co Dublin

Glenveagh Homes commenced construction of 1,200 new homes at Balmoston,a 32 hectare site in Donabate, North Co Dublin. The first phase of construction consists of 432 affordable, private, cost rental and social homes. As part of the civil infrastructure for this site, Glenveagh has to install a deep water attenuation tank to manage the surface water run off more than