Cathedral Road Pumping Station, Cavan Town

Client: P&S Civil Works
Services: Temporary works design for ground support

P&S Civil Works Ltd. appointed Trench Control Ltd. (TCL) to design ground support measures to facilitate the construction of the Cathedral Road Pumping Station for the Cavan Sewage Scheme project. The overall project has been designed by the EMCA. P&S Civil Works Ltd. are the Main Contractor with Trench Control being appointed Temporary Works Designer for the ground support measures only.

The proposed pumping station is approximately 13.1m x 8.3m on plan at the ground surface with the deeper section of the tank at 8.3m x 8.3m on plan. In order to construct the deeper section of the tank, it is proposed to construct a cofferdam of 10.3m x 10.3m on plan to allow for 1m of working room all around. The maximum excavation depth is approximately 9.1m from existing ground level. Design work included routine site inspection to verify the stability of the rock mass exposures and development of contingency rock mass support measures.

cs4

Share:

More Posts

Adare Bypass, Co. Limerick

The Adare Bypass is part of a Sisk Sorenson joint venture to complete 7km of motorway from Foynes to Limerick City by June 2027 at an approx. cost of €150m. One of the projects key objectives is to remove the congestion from the N21 prior to the hosting of the RyderCup at Adare Manor September 2007. Trench Control were asked

Naas, Co. Kildare

The first outing on site for our new side grip vibro hammer which installed 5-6.5m sheets into medium dense ground conditions for Glebe Builders in Naas. The old store was demolished in early April to make way for newlarger supermarket but the boundary line required to retained temporarily whilst a new RC wall could be constructed for the new structure.