Leixlip Water Treatment Plant

Client: Siac
Services: Temporary works design, supply and installation of ground support system

The new stand-alone €30 million water treatment facility will provide water treatment capacity of an additional 80 million litres of water per day for consumers in the Greater Dublin supply area, bringing overall production at Leixlip to 215 million litres per day. The Leixlip Plant is the second largest water treatment plant in the country and supplies approximately 30% of the Dublin Region’s drinking water requirements, supplying North Dublin City and County as well as parts of South County Dublin and Kildare.

Working for Siac, Trench Control designed and installed a large cofferdam in order to facilitate the construction of an aeration tank and other structures as part of the plant upgrade. The temporary works included sheet piling and internal bracing for a total excavation depth approaching 6.5m. The internal bracing comprised proprietary elements of cross struts and flying shores to mitigate lateral sheet pile movement. Driven piles where used to support the 37m span cross struts at midspan.

cs6

Share:

More Posts

Adare Bypass, Co. Limerick

The Adare Bypass is part of a Sisk Sorenson joint venture to complete 7km of motorway from Foynes to Limerick City by June 2027 at an approx. cost of €150m. One of the projects key objectives is to remove the congestion from the N21 prior to the hosting of the RyderCup at Adare Manor September 2007. Trench Control were asked

Naas, Co. Kildare

The first outing on site for our new side grip vibro hammer which installed 5-6.5m sheets into medium dense ground conditions for Glebe Builders in Naas. The old store was demolished in early April to make way for newlarger supermarket but the boundary line required to retained temporarily whilst a new RC wall could be constructed for the new structure.