- Pumping station & Emergency storage tank
- 142no 9.5m PU22-1 sheet piles installed
- 4no 9.5m Omega 18
- 2 levels of hydraulic frames

Pumping station, Full temporary works design supplied and issued by TCL design department

Deep water regeneration project Teesside Project Brief – Graham’s secured the deep water regeneration project from clients Teessworks, to provide the first phase in an extensive regeneration program of the docklands in the Middlesbrough area. TCL were successfully appointed the piling package which included AZ sheet pile anchor wall and PU infill sheets to the front combi-wall as well as the