Station road Portmarnock

  • pumping Station
  • 17.05m x 9.85m cofferdam
  • 92no 9.0m PU22-1 sheet piles supplied and installed by TCL contacting department
  • 4no 9.0m Omega 18 piles supplied and installed by TCL
  • 3 levels of 406 hydraulic frames supplied and installed by TCL
  • Full temporary works design supplied and issued by TCL design department

Share:

More Posts

Deep water regeneration project Teesside

Deep water regeneration project Teesside Project Brief – Graham’s secured the deep water regeneration project from clients Teessworks, to provide the first phase in an extensive regeneration program of the docklands in the Middlesbrough area. TCL were successfully appointed the piling package which included AZ sheet pile anchor wall and PU infill sheets to the front combi-wall as well as the