Case Studies

Station road Portmarnock

  • pumping Station
  • 17.05m x 9.85m cofferdam
  • 92no 9.0m PU22-1 sheet piles supplied and installed by TCL contacting department
  • 4no 9.0m Omega 18 piles supplied and installed by TCL
  • 3 levels of 406 hydraulic frames supplied and installed by TCL
  • Full temporary works design supplied and issued by TCL design department

Share:

More Posts

Adare Bypass, Co. Limerick

The Adare Bypass is part of a Sisk Sorenson joint venture to complete 7km of motorway from Foynes to Limerick City by June 2027 at an approx. cost of €150m. One of the projects key objectives is to remove the congestion from the N21 prior to the hosting of the RyderCup at Adare Manor September 2007. Trench Control were asked

Naas, Co. Kildare

The first outing on site for our new side grip vibro hammer which installed 5-6.5m sheets into medium dense ground conditions for Glebe Builders in Naas. The old store was demolished in early April to make way for newlarger supermarket but the boundary line required to retained temporarily whilst a new RC wall could be constructed for the new structure.