Testimonials

“We’ve worked with Trench Control on the Flintshire Bridge Converter Station Project and we’ve found them to be very knowledgeable both in the planning and the execution of their works” – Brian Dillon, Design Manager with John Sisk & Son


“We’ve worked with Trench Control on the Cathedral Road Pumping Station as part of the Cavan Sewerage Scheme. They provided the Temporary Works Design for the excavation of the Pumping Station structure. We found TCL very helpful throughout the process, and they offered an innovative and practical approach to the design of the temporary works. I would have no hesitation in working with TCL on future projects, based on the experience which we have had to date” – Declan O’Dea, Contracts Manager, P&S Civil Works Ltd.


“…EPS employed Trench Control as a specialist subcontractor to design and install sheet pile cofferdams for large stormwater storage and treatment tanks below ground level as part of the Carberry Muskerry Grouped Wastewater Treatment Plant DBO project. This was an extremely challenging project but Trench Control successfully completed the works in a safe, timely and professional manner. I would highly recommend Trench Control…” – Cathal Hurley, Project Manager, EPS Pumping and Treatment Systems Ltd.


“John Cradock Ltd. have worked with Trench Control Ltd. on the Kilkenny Central Access Scheme and found them to be most proactive in providing a comprehensive temporary works design and subsequent installation which adopted the Client’s complex requirements” – Alan Wright, Director, John Cradock Ltd.


“We’ve worked with Trench Control on the Luas BXD utilities framework and we’ve found them to be very professional and approachable at all times. Our experience working with their team is that they are always able to find solutions to our issues without delay, often at short notice, and this is of great benefit to us in this fast paced environment. It is great to know that we can pick up the phone and rely on their expertise at any time” – Darragh O’Gorman, Site Engineer for Luas Cross City Project, GMC Utilities Group Ltd.


“Trench Control provided all the design drawings, calculations and temporary works design certification for all our shafts in the Osberstown WWTP site. We found them to be very professional and easy to work with. Trench Control also supplied all the frames, hanging chains, power packs etc, which we found to be in excellent condition allowing the works to be completed in a safe and timely manner” – Shane Boland, Project Engineer for the Osberstown Wastewater Treatment Plant Upgrade, Bam Civil Ltd.


“Trench Control have worked with us on the Freshford/Johnstown & Goresbridge Wastewater Treatment Works DBO Contract and we have found them to be very professional and efficient in their work” – Allen Dolan, Project Manager for the Freshford/Johnstown & Goresbridge Wastewater Treatment Works DBO Contract, Source Civil Ltd.


 

“Having worked with Trench Control on multiple schemes of varying sizes in the past, most recently the Barrow- in-Furness Outfall Relocation Project, I have found them to be efficient from the concept stage throughout the design process and carrying out installation to a high standard on site, whilst acting in a professional manner at all times and would have no problem using them on future projects” – Neil Magee, Project Manager, Farrans Construction