learning from experience

Case Studies

reading is everything

important milestones

Lorem ipsum dolor sit amet, conetur adiping elit Lorem ipsum dolor sit amet, cons ectetur adipiscing elit Lorem ipsum dolor sit altmet, conse ctetur adipiscing elit aloma lomiur off silder tolos. Lorem ipsum dolor sitlor amet, conetur adiping elit Lorem ipsum dolor sit amet, consectetur adipiscing elit.

Station road Portmarnock

Pumping station, Full temporary works design supplied and issued by TCL design department

Deep water regeneration project Teesside

Deep water regeneration project Teesside Project Brief – Graham’s secured the deep water regeneration project from clients Teessworks, to provide the first phase in an extensive

Berth 35, Dublin Port

Roadbridge had secured, through a joint venture with Keating’s, the redevelopment of Dublin Port and had already successfully extended and upgraded several berths prior to

Mode Wheel Flood Defence Works

McLaughlin & Harvey won this contract with clients Peel for Manchester District Council to install ground stabilization works along the canal side in Manchester’s Mode

Berth 7 & 8 Combi Wall Installation

Following on from Farrans successful installation of the south side deep water berth at Montrose Harbour, they were the preferred bidder for berths 7&8 on

Northumberland Energy Park

Following on from our successful installation of the south side deep water berth 9 & 10 at Montrose Harbour, Farrans Construction engaged Trench Control services