- Pumping station
- 17.05m x 9.85m cofferdam
- 92no 9.0m PU22-1 sheet piles supplied and installed by TCL contacting department
- 4no 9.0m Omega 18 piles supplied and installed by TCL
- 3 levels of 406 hydraulic frames supplied and installed by TCL
- Full temporary works design supplied and issued by TCL design department