Woodbrook Primary infrastructure Shankill
Pumping station & Emergency storage tank – 2 levels of hydraulic frames
learning from experience

Pumping station & Emergency storage tank – 2 levels of hydraulic frames

Pumping station, Full temporary works design supplied and issued by TCL design department

Deep water regeneration project Teesside Project Brief – Graham’s secured the deep water regeneration project from clients Teessworks, to provide the first phase in an extensive

Roadbridge had secured, through a joint venture with Keating’s, the redevelopment of Dublin Port and had already successfully extended and upgraded several berths prior to

Trench Control were appointed specialist piling sub-contractor by McLaughlin & Harvey to install steel sheet piles of varied lengths and specifications, installed using a number

McLaughlin & Harvey won this contract with clients Peel for Manchester District Council to install ground stabilization works along the canal side in Manchester’s Mode

Trench Control Ltd were appointed specialist piling sub-contractor by L&M Keating Ltd to install sheet piling and steel tube supports for the proposed slipways either

Following on from Farrans successful installation of the south side deep water berth at Montrose Harbour, they were the preferred bidder for berths 7&8 on
Following on from our successful installation of the south side deep water berth 9 & 10 at Montrose Harbour, Farrans Construction engaged Trench Control services

Trench Control are delighted to announce the appointment of Michael Darcy to the position of Operations Director with immediate effect. Michael has been with the