Clonakilty Wastewater Treatment Plant Upgrade (Carberry-Muskerry Wastewater Treatment Plant)

Client: EPS Pumping and Treatment Systems Services: Temporary works design, supply and installation of ground support system The Carbery/Muskerry Wastewater Treatment Plants DBO (design, build and operate) and O&M (operate and maintain) Contract for €6million is primarily a contract to carry out upgrade works to the existing wastewater treatment plant in Clonakilty, providing a treatment […]


Mutton Island Wastewater Treatment Plant Upgrade

Client: Siac Services: Temporary works design, supply and installation of ground support system The rapid growth of Galway city and environs now means that the existing Mutton Island Wastewater Treatment Plant is nearing design capacity and with growth projected to continue, there is a requirement to increase its capacity to cater for both residential and industrial expansion within […]


Barrow-in-Furness Wastewater Treatment Plant Upgrade

Client: Farrans Services: Temporary works design, supply and installation of ground support system The current outfall arrangement involves final effluent being pumped from a tidal pump house at the west of the works via a 1200mm diameter glass reinforced plastic (GRP) pipe which passes beneath a sea defence bund. From this point the outfall continues as a […]


Osberstown Wastewater Treatment Plant Upgrade

Client: Bam Contractors Services: Temporary works design, supply of ground support system County Kildare’s population has increased dramatically since 2006 and Kildare is now the 4th most populous county in the Republic. Consequently, an application to the DoEHLG was been submitted by Kildare County Council for a Stage III upgrade to the Osberstown facility to 130,000 population equivalent […]



North Leixlip Sewage Works

Client: Terra Solutions Services: Temporary works design, supply of ground support system The Lower Liffey Valley Sewerage Scheme Wastewater Treatment Plant Upgrade aims to upgrade the existing Leixlip WWTP from 80,000 population equivalent to its ultimate capacity of 150,000. The WwTP expansion is required to accommodate predicted future increases in wastewater flows up to a population equivalent […]


M9 Kilcullen Services Upgrade, Pier Foundation Temporary Works

Client: Clonmel Enterprises Services: Temporary works design, supply and installation of ground support system The new M9 Services began work in 2013 and involved significant earthworks and a new motorway crossing. The bridge superstructure comprises bankseat abutments and piers. Owing to a significant depth of soft ground the pier foundations were founded at depth below the existing motorway […]


Swords Wastewater Treatment Plant Phase 2 Expansion

Client: Siac / Aecom Services: Temporary works design, supply and installation of ground support system Since completion of the Phase 1 expansion works in 2003, growth in the Swords catchment has outstripped the treatment works’ current capacity, causing it to operate above its maximum design of 90,000 population equivalent. The Phase 2 expansion and upgrading the treatment plant […]


Freshford Wastewater Treatment Plant Upgrade

Client: Source Civil Services: Temporary works design, supply and installation of ground support system Part of a €3.6million scheme incorporating Freshford, Johnstown and Goresbridge, Response Group (parent of Source Civil) were appointed by Kilkenny Co. Co. as the main contractor to design, build and operate new wastewater infrastructure for the villages of Freshford, Johnstown and […]