Trench Control using a Movax hammer to extract sheet piles at the Exo building in Dublin. The piles were installed earlier in the year on behalf of Bennett Construction, and TCL’s work on the site is nearing completion.
Case Studies
Our 14/17 leader rig hard at work on the flood alleviation scheme in Clonakilty, Co. Cork.
We are currently auguring and driving up to 1100 number steel sheet piles, 12.0 metres in length for Ward and Burke. Production rates have been excellent given the great weather and conditions, and we look forward to completing an excellent job, on schedule.
Construction of a roll on roll off dock for the new Greenore to Greencastle ferry
Trench Control recently completed a piling project on behalf of L & M Keating at Greenore Co. Louth. The project involved the construction of a roll on roll off dock for the new Greenore to Greencastle ferry, a €10m project. TCL drove 60 no. sheet piles up to 11.0m in depth to form a cofferdam, […]
Clonakilty Wastewater Treatment Plant Upgrade (Carberry-Muskerry Wastewater Treatment Plant)
Client: EPS Pumping and Treatment Systems Services: Temporary works design, supply and installation of ground support system The Carbery/Muskerry Wastewater Treatment Plants DBO (design, build and operate) and O&M (operate and maintain) Contract for €6million is primarily a contract to carry out upgrade works to the existing wastewater treatment plant in Clonakilty, providing a treatment […]
Mutton Island Wastewater Treatment Plant Upgrade
Client: Siac Services: Temporary works design, supply and installation of ground support system The rapid growth of Galway city and environs now means that the existing Mutton Island Wastewater Treatment Plant is nearing design capacity and with growth projected to continue, there is a requirement to increase its capacity to cater for both residential and industrial expansion within […]
Barrow-in-Furness Wastewater Treatment Plant Upgrade
Client: Farrans Services: Temporary works design, supply and installation of ground support system The current outfall arrangement involves final effluent being pumped from a tidal pump house at the west of the works via a 1200mm diameter glass reinforced plastic (GRP) pipe which passes beneath a sea defence bund. From this point the outfall continues as a […]
Osberstown Wastewater Treatment Plant Upgrade
Client: Bam Contractors Services: Temporary works design, supply of ground support system County Kildare’s population has increased dramatically since 2006 and Kildare is now the 4th most populous county in the Republic. Consequently, an application to the DoEHLG was been submitted by Kildare County Council for a Stage III upgrade to the Osberstown facility to 130,000 population equivalent […]
Youghal Main Drainage Scheme
Client: Wills Bros. Services: Temporary works design, supply and installation of ground support system Youghal is situated on the Blackwater Estuary, which is environmentally sensitive and an area of significant recreational activity. The town has a population of 6,990 (2011 Census) but this can increase to 14,000 in the summer months with an influx of tourists and […]
North Leixlip Sewage Works
Client: Terra Solutions Services: Temporary works design, supply of ground support system The Lower Liffey Valley Sewerage Scheme Wastewater Treatment Plant Upgrade aims to upgrade the existing Leixlip WWTP from 80,000 population equivalent to its ultimate capacity of 150,000. The WwTP expansion is required to accommodate predicted future increases in wastewater flows up to a population equivalent […]
M9 Kilcullen Services Upgrade, Pier Foundation Temporary Works
Client: Clonmel Enterprises Services: Temporary works design, supply and installation of ground support system The new M9 Services began work in 2013 and involved significant earthworks and a new motorway crossing. The bridge superstructure comprises bankseat abutments and piers. Owing to a significant depth of soft ground the pier foundations were founded at depth below the existing motorway […]